Technical and Economic Evaluation of Implementing Outage Management System in Urban Distribution Systems in Iran
Subject Areas : electrical and computer engineeringM. R. Hghifam 1 , E. Alishahi 2
1 - Tarbiat Modares University
2 -
Keywords: Outage management system automation technical and economic evaluation,
Abstract :
Faults in MV systems are the cause of almost 70 percent of outages in power system. By using suitable outage management methods, amount of power outages will be reduced in large extent. In Iran, traditionally outage management system was conducted by trial and error methods and relied on operators’ experience. The ever-increasing expansion of distribution networks has made it impossible to use traditional outage management systems. Outage management systems depend upon load type, load sensitivity, network type, amount of accumulation of load and population, and being rural or urban network. In this paper, at first a technical assessment for implementing outage management methods in distribution systems of Iran is carried out. An economic assessment of implementing outage management system in urban distribution systems of Iran with dense population is conducted. For this purpose a sample network of Afsarieh area of Tehran has been chosen.
[1] A. D. Filomena, M. Resener, and A. S. Bretas, "Hybrid fault diagnosis scheme implementation for power distribution systems automation," IEEE Trans. on Power Delivery, vol. 23, no. 4, pp. 1846-1856, Oct. 2008.
[2] N. I. Elkalashy, M. Lehtonen, H. A. Darwish, A. M. I. Taalab, and M. A. Izzularab, "DWT-based detection and transient power direction - based location of high-impedance faults due to leaning trees in unearthed MV networks," IEEE Trans. on Power Delivery, vol. 23, no. 1, pp. 94-101, Jan. 2008.
[3] L. G. Santander, P. Bastard, M. Petit, I. Gal, E. Lopez, and H. Opazo, "Down - conductor fault detection and location via a voltage based method for radial distribution networks," in IEE Proc. Gener. Transm. Distrib., vol. 152, no. 2, pp. 180-184, Mar. 2005.
[4] M. Lehtonen, "Fault Management in Electrical Distribution Systems," Final Report of the CIRED Working Group WG03 Fault Management, Espoo, Finland, vol. 22, Dec. 1998.
[5] M. Lehtonen, et al., "Automatic fault management in distribution networks," in Proc. IEE Electricity 16th Int. Conf. and Exhibit. on Distribution, Part 1, Contributions, Pub no. 482, vol. 3, pp., 18-21 Jun. 2001.
[6] A. Fujisawa, N. Kurokawa, and T. Corporation, "Oversea distribution automation system based on Japanese experience," in Proc. IEEE/PES Transmission and Distribution Conf. and Exhibit., vol. 2, pp. 1164-1169, 6-10 Oct. 2002.
[7] J. McDonal, "Equipment for feeder automation recent trends in feeder automation seminar," IEEE PES Miam Chapter, KEMA Inc., Miami, Florida, 2 Jun. 2005.
[8] C. L. Su and J. H. Teng, Economic Evaluation of Distribution Automation Project, Department of Marine Engineering, National Kaohsiung Marine University Kaohsiung, Department of Electrical Engineering, I-Shou University, Kaohsiung, Taiwan, 2006.
[9] R. E. Brown, "Electric power distribution reliability," Marcel Dekker, Inc, New York, Basel 2002.
[10] S. Mathew, Wind Energy Fundamentals, Resource Analysis, and Economics, Springer-Verlag Berlin Heidelberg 2006.